EIA Study & Engineering studies for the Wastewater treatment Plant in Marathon

The project concerned the Environmental Impact Assessment Study for the sewage system, the wastewater treatment plant and the disposal system of the Municipality of Marathon.

The WWTP was designed to serve approximately 100.000 inhabitants (population equivalent).

Share:
facebook
twitter