Supervision for the Sewage System of Nea Peramos

The project concerned the construction of the sewage system in areas of Nea Peramos and was co-funded under the Operational Program “Environment & Sustainable Development 2007-2013″. The budget of the project was 14 million Euros. More specifically, the project concerns: the construction of internal sewage system in areas of Nea Peramos (with total length of 35.395 m), the central collector pipe (with total length of 3.160 m) and the wastewater pipeline to the wastewater treatment plant of Megara (with total length of 9.485 m).

The services provided included: a) Support during the tendering procedure until the signature of the contract, b) Technical and financial management/administration of the project, c) Construction Supervision.